3 Marla Double Storey Construction Cost June 2026 in Pakistan | Complete House Cost Breakdown

3 Marla Double Storey Construction Cost June 2026 Pakistan
Complete cost estimate of a 3 Marla double storey house in Pakistan using June 2026 construction rates.

Building a house is one of the most important investments for any family. Before starting construction, preparing a complete cost estimate helps homeowners manage their budget and avoid unexpected expenses during construction.

In this article, we provide a detailed cost estimate for a 3 Marla Double Storey House in Pakistan based on June 2026 market rates. The estimate includes grey structure cost, plumbing work, electrical work, finishing work, kitchen cost, tile work, paint work, aluminum work, and all major construction components.

This practical estimate is based on a covered area of approximately 816.72 square feet and can serve as a useful guide for homeowners, civil engineers, contractors, and construction students.

Project Overview

DescriptionDetails
Plot Size20 × 45
House TypeDouble Storey
Covered Area (Ground Floor)720 Sq.ft
Covered Area (FirstnFloor + Mumty)630 Sq.ft
Construction StandardStandard Residential
Rates UpdateJune 2026
LocationPakistan

Total Construction Cost Summary

DescriptionCost
Grey Structure CostRs. 4,191,536
Finishing CostRs. 2,148,655
Grand Total CostRs. 6,340,191

Total House Construction Cost

💰 Rs. 6,340,191

Cost Per Square Foot

💰 Rs. 4,662 Per Sq.ft


Grey Structure Cost Breakdown

Grey structure includes excavation, foundation, DPC, brick masonry, RCC work, plaster, plumbing sleeves, electrical conduits, and related structural works.

Major Material Cost

MaterialCost
BricksRs. 773,200
CementRs. 562,650
SteelRs. 530,000
SandRs. 120,250
Crush AggregateRs. 139,455

Total Major Material Cost

💰 Rs. 2,127,555


Plumbing Work Cost

The plumbing estimate includes water supply lines, drainage system, septic tank connections, floor drains, and plumbing accessories.

Total Plumbing Cost

💰 Rs. 251,721


Electrical Work Cost

Electrical work includes conduits, switch boxes, wiring accessories, distribution boxes, and electrical installation.

Total Electrical Cost

💰 Rs. 627,000


Other Construction Materials

This section includes:

  • Excavation & Backfilling
  • Formwork
  • Bitumen
  • Polythene Sheet
  • Termite Spray
  • Chokhat
  • Safety Grill
  • Electric Meter

Total Other Material Cost

💰 Rs. 510,260


Grey Structure Labour Cost

The labour estimate includes masonry work, RCC work, plaster work, and other structural activities.

Total Labour Cost

💰 Rs. 675,000


Total Grey Structure Cost

💰 Rs. 4,191,536


Finishing Cost Breakdown

Finishing work significantly affects the overall house quality and appearance.


Tile & Marble Work

Includes floor tiles, wall tiles, stairs, kitchen top granite, and tile fixing charges.

Total Tile & Marble Cost

💰 Rs. 625,805


Stair & Terrace Railing

Total Railing Cost

💰 Rs. 95,700


Kitchen Cost

Includes kitchen hood, kitchen cabinets, and modern kitchen fittings.

Total Kitchen Cost

💰 Rs. 181,000


Bathroom Fittings Cost

Includes:

  • Wash Basin
  • WC Set
  • Shower Set
  • Mixer
  • Looking Mirror
  • Towel Accessories

Total Bathroom Cost

💰 Rs. 209,550


Paint & Ceiling Cost

Total Paint & Ceiling Cost

💰 Rs. 367,600


Wooden Door Cost

Includes:

  • Main Door
  • Room Doors
  • Washroom Doors
  • Terrace Doors

Total Wooden Door Cost

💰 Rs. 345,000


Aluminium Work Cost

Includes:

  • Aluminum Windows
  • Bathroom Ventilators

Total Aluminium Work Cost

💰 Rs. 172,800


Wardrobe & Safe Cost

Total Wardrobe Cost

💰 Rs. 151,200


Total Finishing Cost

💰 Rs. 2,148,655


Grand Total House Construction Cost

DescriptionCost
Grey StructureRs. 4,191,536
FinishingRs. 2,148,655
Total CostRs. 6,340,191

Final Construction Cost

💰 Rs. 63.40 Lac


Internal Links to Add

5 Marla Grey Structure Button May 2026 5 Marla Grey Structure Cost — Complete Estimate

Factors Affecting Construction Cost

Several factors can affect the final budget:

  • Steel rate fluctuations
  • Cement price changes
  • Labour rates
  • Quality of finishing materials
  • Kitchen design selection
  • Door and window specifications
  • Plumbing fixtures quality

Tips to Reduce Construction Cost

✔ Prepare complete drawings before construction

✔ Purchase materials in bulk

✔ Monitor labour productivity

✔ Avoid unnecessary design changes

✔ Use quality materials to reduce maintenance costs

✔ Maintain proper curing of RCC members


Frequently Asked Questions

What is the construction cost of a 3 Marla double storey house in June 2026?

The estimated construction cost is approximately Rs. 6.34 Million (63.40 Lac).

What is the grey structure cost?

The grey structure cost is approximately Rs. 4.19 Million.

What is the finishing cost?

The finishing cost is approximately Rs. 2.15 Million.

What is the construction cost per square foot?

The estimated construction cost is approximately Rs. 4,662 per square foot.

Which item contributes the highest cost?

Grey structure construction contributes the largest portion of the total project cost.

Conclusion

The estimated cost of constructing a 3 Marla double storey house in Pakistan during June 2026 is approximately Rs. 63.40 Lac. This estimate includes both grey structure and finishing work using current market rates.

Proper planning, budgeting, and quality supervision can help homeowners complete construction efficiently while maintaining high construction standards.

Muhammad Bilal Civil Engineer Construction Specialist
Muhammad Bilal
Muhammad Bilal is a Civil Engineer and Construction Specialist with an MS in Engineering Management and 13+ years of professional experience. He shares practical construction knowledge, cost estimation, and RCC site expertise at CivilConstructionGuide.com.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top