PCC Concrete Calculator

Civil Construction Guide — By Engr. Muhammad Bilal

Description Value
Total Area
Wet Volume
Dry Volume
Cement Quantity
Sand Quantity
Crush Quantity
Material Cost
Labour Cost
Total Cost
Contractor Profit (15%)
Grand Total
Cost Per Sq.ft

Formula Used

Wet Volume = Length × Width × Thickness ÷ 12

Dry Volume = Wet Volume × 1.54

Material quantities are calculated according to selected PCC ratio.

Labour Productivity = 1 Mason + 2 Labour can complete approximately 100 CFT PCC work per day.