Civil Construction Guide — By Engr. Muhammad Bilal
| Description | Value |
|---|---|
| Total Area | |
| Wet Volume | |
| Dry Volume | |
| Cement Quantity | |
| Sand Quantity | |
| Crush Quantity | |
| Material Cost | |
| Labour Cost | |
| Total Cost | |
| Contractor Profit (15%) | |
| Grand Total | |
| Cost Per Sq.ft |
Wet Volume = Length × Width × Thickness ÷ 12
Dry Volume = Wet Volume × 1.54
Material quantities are calculated according to selected PCC ratio.
Labour Productivity = 1 Mason + 2 Labour can complete approximately 100 CFT PCC work per day.