A+ Class Construction payment planner

Designed with Precision. Built with Trust.

Enter cumulative certified gross work, actual receipts and retention releases per stage. Mobilization is included in the schedule; do not enter it twice. Rates and percentages must follow your contract.

Milestone%Scheduled PKRCertified grossRetention exemptRetention heldReleasedReceivedOutstandingRemove

Planning tool only; not a formal payment certificate. Data is not saved. Negative outstanding means excess receipts. Taxes and advance recovery are outside this planner.

Premium turnkey construction payment guide

A+ Class is a commercial specification, not a universal engineering grade. Agree the exact brands, allowances, samples and workmanship criteria. Premium glazing, custom cabinetry and imported fixtures can have long lead times; record procurement commitments separately from installed work.

Using the calculator

  1. Enter agreed area and rate or lump sum.
  2. Record approved additions and omissions.
  3. Customize milestones to total 100%.
  4. Enter certified work, retention releases and receipts.
  5. Print the report and retain supporting documents.

Worked example

For an illustrative Rs. 20 million contract, a 10% doors, windows and cabinetry milestone allocates Rs. 2 million. This is not a market quotation. Payment depends on accepted work and agreed procurement terms.

Premium finish inspection

Approve mock-ups, glazing, hardware and joinery samples before procurement. Check waterproofing, tile alignment, paint finish, fixture commissioning and snag closure. Document substitutions and cost differences in writing. Retention release must follow the signed agreement.

Frequently asked questions

Should imported materials be paid for in advance?

Only under agreed procurement terms with evidence of ownership, delivery and appropriate safeguards.

Can the schedule be customized?

Yes. The default percentages are illustrative. Keep the total at 100%.

Does the tool issue a formal certificate?

No. It tracks payments; taxes and advance recovery require separate assessment. Data is not saved.